THE C-BLOCK™ TOUR DE FRANCE

STAGE 4 - CHINON

COLDPAD - Tour de france du c-block - C-BLOCK icon

Heavy duty & Antiseismic

Rated for Nuclear Power Plants

COLDPAD - Tour de france du c-block - non intrusive

Non-Intrusive

No need for concrete scanning and no hole

COLDPAD - Tour de france du c-block - Temporary or permanent icon

Temporary or Permanent 

Rated for 60 years Removable in 30s

COLDPAD - TOUR DE FRANCE DU C-BLOCK - A STARTING POINT

A starting point

In the context of the maintenance of low pressure vessels in nuclear power plants, it is generally necessary to install a rail to carry out lifting operations.
 
It is often difficult to find anchor points in the vicinity, and the installation of new anchors on the ceiling generates numerous difficulties both operational (concrete scanner, authorizations, planning) and economic.

A unique and reliable solution

With C-BLOCK™, it is possible to install the rail directly on the concrete ceiling without impacting its integrity (no holes).

 

The final assembly is safer for lifting operations, and installed 40% faster (7 days for the installation of 64 anchors with C-BLOCK™ versus 12 days for dowels) and with fewer personnel.

COLDPAD - TOUR DE FRANCE DU C-BLOCK - A UNIQUE AND RELIABLE SOLUTION
COLDPAD - TOUR DE FRANCE DU C-BLOCK - THE RESULT OF A KEY PARTNERSHIP
The result of a key partnership

In addition, our solution improves the safety of the personnel: lighter and less noisy equipment, and without vibrations but also more ergonomic because self-supporting.

 

C-BLOCK™ also ensures full traceability of anchoring operations thanks to the recording of installation data. It is also easily inspectable and eliminates any risk of malfunction.